New Barge Layout Facility
Marine Construction & Gate Repair
Marine Work, Sheet Pile Installation, Cast in Place Concrete, H-Pile Installation

OCCIs scope of work included the installation of sheet pile mooring cells alongside the existing grain elevators, primarily accomplished through vibro-driving techniques for efficient placement. Following the driving operations, the sheet pile cells were filled with rock and capped with cast-in-place concrete and complemented by a concrete deadman for securing the mooring slide lines. The successful completion of these cells and the associated cable slide lines significantly enhanced the facility's capacity, allowing the facility to utilize large grain barge loads.