Location: Richmond, TX Completed: 2016 Owner: Union Pacific Railroad
OCCI provided emergency response to repair two bridge piers on the Brazos River...
Location: Rock Island, IL Completed: 2016 Owner: Iowa Interstate Railroad
Rail lift rehabilitation was completed on the Arsenal Bridge in Rock Island, IL....
Location: Washington D.C. Completed: 2016 Owner: CSX Transportation
OCCI, Inc. completed the project to remove and replace over 450,000 lbs...
Location: Sioux, IA Completed: 2015 Owner: Union Pacific Railroad
OCCI teamed with UPRR to design and construct a new bridge under emergency response conditions...
Location: Elnora, IN Completed: 2015 Owner: The Indiana Rail Road Company
OCCI, Inc. completed the rehabilitation and modification of the existing bridge structure...
Location: Yazoo Subdivision, MS Completed: 2014 Owner: Canadian National Railway
Missouri Fabricators was contracted to fabricate three Through Plate Girder (TPG) Spans...
Location: Van Buren, AR Completed: 2014 Owner: Arkansas & Missouri Railroad
OCCI provided emergency response to lower the 450’ lift span after the haul ropes failed...
Location: Vicksburg, MS Completed: 2014 Owner: Louisiana Department of Transportation
OCCI quickly completed this cost plus time project to perform Bridge Modifications and Steel Repair...
Location: Ponca City, OK Completed: 2014 Owner: BNSF Railway Company
The existing Bridge 294.1 consisted of two deck plate girder spans and three 124’ through truss spans...
Location: Wetumka, OK Completed: 2013 Owner: BNSF Railway Company
Missouri Fabricators was selected to fabricate two beam assemblies for railroad Bridge...