Remove Existing Bridge & Build New Double Track Bridge

Location: Bosworth, MO
Completed: 2018
Owner: BNSF Railway Company

OCCI performed demolition and removal of the existing bridge crossing the Grand River then built a new double track bridge. This work included temporary work bridge and temporary access roads along with installation of track panels on the bridge.