Location: Washington D.C.
Completed: 2016
Owner: CSX Transportation
OCCI, Inc. completed the project to remove and replace over 450,000 lbs of steel stringers on existing bridge. All access was gained from floating plant beneath the structure and completed during nightly track closures. No work was allowed to be performed from the track. The new steel was fabricated and painted by Missouri Fabricators.