Bridge Construction

OCCI has experience in cast in place concrete, precast concrete and steel bridge construction with a variety of foundation types.

Recently Completed Bridge Construction Projects

Rope Replacement Bridge 108.11 over Ohio River

Replacement of all 64 of the 2" counterweight operating wire ropes...

Project Info

Counterweight Cable Replacement Bridge K765.9

This project included the removal and replacement 32 original...

Project Info

Bridge Rehab & Complex Steel Repair

OCCI offers an innovative construction approach to rehabilitation and repair of existing bridges. The location, proximity to other structures, and unknowns encountered during a rehab project offer opportunities for OCCI to provide engineered solutions to complex problems.

Recently Completed Bridge Rehab & Complex Steel Repair Projects

McComb Spillway Bridge Replacement

New, 12,000' precast railroad bridge over Lake Pontchartrain in...

Project Info

I-20 MRB at Vicksburg Overlay & Rehab

The work involved consists removal of the 1-1/2" of the bridge deck...

Project Info

Design – Build

OCCI has the experience to complete your design-build project. We are well-versed in assessing the constructability and economic feasibility of projects, and utilize engineering expertise to provide the best design within the specified budget.

Recently Completed Design – Build Projects

Replace Spillway Catwalk and add Trunnion Pin Access

The design-build project consisted of design, fabrication and installation of catwalks...

Project Info

Pier Reconstruction of Swing Span Bridge

OCCI completed a Design-Build overhaul of the nearly 90 year old railroad bridge across the...

Project Info

Emergency Response

OCCI’s dedicated team is available to respond to emergency situations. Often our crew will provide an immediate fix and then remain involved to ensure a well-though permanent solution can be implemented as time and resources allow.

Recently Completed Emergency Response Projects

Emergency Stabilization of Two Brazos River Piers – UPRR Bridge 32.42

OCCI provided emergency response to repair two bridge piers on the Brazos River...

Project Info

Emergency Response to Re-Build Bridge 24.75

OCCI teamed with UPRR to design and construct a new bridge under emergency response conditions...

Project Info

Lock & Dam Rehabilitation

The infrastructure of the lock and dam system in the central and eastern United States is aging, OCCI has the skills and capability to perform the needed rehabilitation and repairs to these massive structures.

Recently Completed Lock & Dam Rehabilitation Projects

Soo Locks Compensating Works Gate Automation

OCCI performed as a subcontractor on this project...

Project Info

Spillway Tainter Gate Repairs, Harlan County Spillway

OCCI completed the project as the prime contractor. This work...

Project Info

Marine Construction

Many of projects completed by OCCI are executed in a marine environment. We own barges, tugboats, and other necessary marine equipment to successfully deliver the project.

Recently Completed Marine Construction Projects

McComb Spillway Bridge Replacement

New, 12,000' precast railroad bridge over Lake Pontchartrain in...

Project Info

Rope Replacement Bridge 108.11 over Ohio River

Replacement of all 64 of the 2" counterweight operating wire ropes...

Project Info

Railroad Bridge Schedule Critical Change Outs

OCCI prides itself in executing critical change outs within the scheduled duration. Our managers and hard working craftsmen are committed to meeting the demands of our clients.

Recently Completed Railroad Bridge Schedule Critical Change Outs Projects

Rope Replacement Bridge 108.11 over Ohio River

Replacement of all 64 of the 2" counterweight operating wire ropes...

Project Info

Repair Steel Spans 8-15 and 17-19 at Bridge 000 709.3 West Pascagoula River

This project included the removal and replacement of 66 stringers...

Project Info

Steel Fabrication

Missouri Fabricators as a division of OCCI, Inc. is an AISC certified Advanced Bridge Fabricator with Fracture Critical Endorsement and Sophisticated Paint Endorsement – Enclosed.

Recently Completed Steel Fabrication Projects

Repair Steel Spans 8-15 and 17-19 at Bridge 000 709.3 West Pascagoula River

This project included the removal and replacement of 66 stringers...

Project Info

Bayou Des Allemands Remove and Replace Swing Span

This project included the removal and replacement...

Project Info

Bridge Construction

Bridge Rehab & Complex Steel Repair

Design – Build

Emergency Response

Lock & Dam Rehabilitation

Marine Construction

Railroad Bridge Schedule Critical Change Outs

Steel Fabrication